Computer Storage Facility- Guernsey
Below there is a selection of photos showing the various stages of a contract we completed earlier this year in St Peters Port, Guernsey, Channel Islands.
Fabrication of the steelwork began in late February at our purpose built fabrication workshop in Hunningham, Warwickshire.
Fabricated and painted columns ready for loading
|
Steelwork loaded and leaving for Guernsey
|
The preceeding week we had delivered and installed the holding down bolt assemblies that had been prepared at our works.
Setting holding down bolts in position
|
Holding down bolt assemblies ready for concreting
|
The main and secondary (cold rolled) steel arrived on Saturday afternoon, the same day as our erectors arrived by ferry from the
mainland. Sunday morning all steel was offloaded and erection of the main steelwork started.
Unloading and getting ready for erection
|
First steel members to be erected
|
Monday and Tuesday saw our erectors progressing well and also the fixing of the secondary steel was able to begin.
Main steelwork nearing completion
|
Secondary steelwork being fitted
|
Wednesday saw the completion of the main steelwork which left the erection of staircases and the remainder of the secondary
steel to be fitted
Main steelwork completed
|
Staircase steel being erected
|
By the end of the first week safety nets and handrails were in place ready to start boarding out the first and second floors.
Safety nets in place while boarding floors
|
Boards being layed on top floor
|
Whilst the floors were being boarded all the exterior secondary steelwork was put into place and made ready for the exterior cladding
to begin. This was to be insulated composite panels. Using these ensured an easy and very quick way of closing
the building off from the elements.
Both floors boarded and exterior ready to be clad
|
Composite cladding panels being loaded out ready for fitting
|
All composite panels were fitted and also all related flashings were completed over a period of 15 days. This enabled other
contractors to commence with the installation of the computer pods. As soon as this was done it was the end of our part of
the contract. Completed ahead of shedule and with no hold ups.
One side nearing cladding completion
|
Side cladding completed
|
All cladding completed
|
|
 |
|
|